News

1
2
3
4
»
Modular dock and associated load-house project complete and handed over to our client!

Modular dock and associated load-house project complete and handed over to our client!

2nd October, 2025

Armo have been manufacturing high quality loading bay and lifting table solutions since 1973 for further technical or pricing information, please contact us.

A goods lift installation was recently completed in the London area

A goods lift installation was recently completed in the London area

12th September, 2025

Product on and off on the short side of the lift at the lower level, and product on and off on the long side of the lift at the upper level. Supplied with interlocked drop-down bolts and interlocked electro/mechanical locks so that both the upper and lower-level gate systems cannot be opened until the lift reaches the desired level. Armo have been manufacturing high quality loading bay and lifting table solutions since 1973 for further technical or pricing information, please contact us.

Modular dock and associated load-house nearing completion

Modular dock and associated load-house nearing completion

5th September, 2025

Armo have been manufacturing high quality loading bay and lifting table solutions since 1973 for further technical or pricing information, please contact us.

Modular Dock and Load House Installation in Oxfordshire

Modular Dock and Load House Installation in Oxfordshire

20th August, 2025

This scheme includes a 12 metre x 11 metre raised modular dock, incorporating 2 x loading bays, complete with a 21 metre long access ramp.  More photos of the installation to follow as works progress. Armo have been manufacturing high quality loading bay and lifting table solutions since 1973 for further technical or pricing information, please contact us.

New build construction project underway in Kirkham!

New build construction project underway in Kirkham!

25th July, 2025

6no. Model ARSL dock levellers installed into pre-cast concrete pits, ready for the final concrete floor pour. Armo have been manufacturing high quality loading bay and lifting table solutions since 1973 for further technical or pricing information, please contact us.

The existing swing lip levellers were supplied by Armo 18 years ago and are still going strong!

The existing swing lip levellers were supplied by Armo 18 years ago and are still going strong!

11th July, 2025

Our client wanted to upgrade 4 x of his existing bays from swing lip to the more sophisticated telescopic lip dock levellers that provides finite lip positioning, which is critical for this client, whilst offloading containers. The existing units were removed, leaving the cast-in framework in position. This enables us to provide a flat frame suspended design that is welded to the existing cast-in steelwork. This design provides the benefit of not having to undertake expensive and messy civil wo

Door only installation works completed in Hampshire!

Door only installation works completed in Hampshire!

4th July, 2025

2no. 6085mm wide x 5800mm high uninsulated electrically operated doors and 2no. smaller insulated electrically operated doors. Armo have been manufacturing high quality loading bay and lifting table solutions since 1973 for further technical or pricing information, please contact us.

Model ARGL Lift Installation Completed in Bournemouth

Model ARGL Lift Installation Completed in Bournemouth

27th June, 2025

Designed, manufactured and installed to transfer Euro bins from one level to another. Armo have been manufacturing high quality loading bay and lifting table solutions since 1973 for further technical or pricing information, please contact us.

Loading bay upgrade completed at Gravelly Point in Birmingham

Loading bay upgrade completed at Gravelly Point in Birmingham

20th June, 2025

Our client wanted the flexibility of accommodating both single-deck trailers and higher double-deck trailers across 17 loading bays. Armo (UK) put forward proposals and received an order for: 17 Model ARSR multi-purpose double-deck dock shelters 3450mm wide x 4300mm high x 900mm deep, complete with a 1800mm long head curtain with slits and a high-level step detail to accommodate cladding protrusion. 17 sets of Model ARDB polyethylene yellow solid face buffers backed by a rubber shock absor

Auto Plant in South Wales Chooses Armo High-Speed Doors for Efficiency Upgrade

Auto Plant in South Wales Chooses Armo High-Speed Doors for Efficiency Upgrade

13th June, 2025

Car part production plant in South Wales invests in Armo (UK) high speed door! 5 x Model ARHS roll up doors Black door leaf with viewing windows Wind class 3 Opening speed up to 2.0m/s 2500mm high integrated safety light curtain 3 x doors activated by radars  2 x interlocked doors within a airlock activated via floor mounted induction loops Armo have been manufacturing high quality loading bay and lifting table solutions since 1973 for further technical or pricing information, p

1
2
3
4
»

Accreditations & Partners

Kingspan
ISO 9001
CE Marking
Safe Contractor Approved
Castell
DHF