21st November, 2019
We have upgraded the existing loading bays, by replacing the dock Levellers, buffers, retractable dock shelter and installing Traffic lights....
12th November, 2019
Armo (UK) installed retractable dock shelters. They cater for a mixture of vehicles and protects the loads and the employees from the outside elements....
6th November, 2019
On this project we have manufactured and installed a new Armo Swing Lip Dock Levellers. ...
4th November, 2019
Our client is a premium producer of chilled savoury pastry products in the UK. The Group has a passion for food; this comes through in the quality and range of its products, and the techniques and standards it applies to producing them. Following a site survey by one of our highly experienced Project Managers, we have upgraded the existing sectional door and replaced it with an ARMO AROD Insulated Sectional Overhead Doors. AROD Insulated Sectional Overhead Doors The AROD Insulated Sectional O
29th October, 2019
Our client is one of the north largest and most successful construction firms. They have grown from a small regional contractor to a multi-million-pound business operating nationally in 20 years. They take great pride in the high quality of service they deliver and their client satisfaction. Key to that success is developing close working relationships with their clients and adding value to their projects. On this occasion we are pleased to be working with them to install 16no. ARMO Retractable
25th September, 2019
Our client is one of Europe’s leading food processors, with over sixty years of industry experience. They have developed a reputation for quality, efficiency and innovation. These values run throughout the business and have been essential in making sure that they are able to deliver exactly what their customers need when they need it. As their loads are getting larger, Armo UK was called in to upgrade some of their loading bays to accommodate double deck loads. Due to the success of the f
6th September, 2019
Our client is a leading distributor of IT solutions, including infrastructure, networking and electronic security solutions. Following a site survey, by one of Armo’s Project Managers. We recommended and designed two loading bays utilising dock levellers to achieve an effective and safe loading bay solution, that not only speeds up loading and unloading, but keeps employee safe from potential health and safety risks. Armo Swing Lip Dock Leveller Model ARSL Armo dock levellers are robust
26th August, 2019
Armo are once again working with one of the best Midlands contractors, providing complete design, management and build for commercial and residential property development projects. We are pleased to be working with them on another project for a new development in Nottinghamshire. We have installed 7 new complete loading bays, including ARSR Retractable Dock Shelters, Swing Lip Dock levellers, LED Traffic Lights, Dock Loading Lights and Dock Buffers. Details below of the products we installed:
2nd August, 2019
Our client is Europe’s main importers of fruit and are leading the global market in organic and fair-trade fruit. They have been trading with growers all over the world for over 50 years are looking to do so for another 50 years. We have created a new loading bay in an existing building, this was achieved in two phases. Firstly, we created an opening and installed AROD Insulated Sectional Overhead Door. Then we ensured all the cladding, barriers and brickwork are made good. Secondly,
17th June, 2019
Following the successful upgrade of the loading bays in a leading supermarket. We are pleased to be working with them again on the upgrade of their industrial doors....