News

1
2
3
4
»
Project Completed in Gosport – A Tailored Dock Leveller Solution!

Project Completed in Gosport – A Tailored Dock Leveller Solution!

21st November, 2025

We’re pleased to share the successful completion of a bespoke loading bay upgrade for our client in Gosport. The client was no longer achieving the required operating range from their existing 2500mm dock leveller as newer trailers began frequenting the site. They approached Armo for expert, tailor-made advice—and we delivered. To meet the updated operational demands, we proposed increasing the leveller length by 2000mm, creating a fully customised 4500mm unit. Instead of e

Our newest bespoke loading bay installation is complete and operational in Chessington!

Our newest bespoke loading bay installation is complete and operational in Chessington!

11th November, 2025

Armo have been manufacturing high quality loading bay and lifting table solutions since 1973 for further technical or pricing information, please contact us.

2 x High Speed Doors completed in Worcester

2 x High Speed Doors completed in Worcester

30th October, 2025

- 1 x door installed directly behind the existing roller shutter door. - 1 x door installed on the outside face of the building in front of the existing roller shutter door. Both doors are provided with a wind class 3 protection and are activated by forklift remotes. This system provide the flexibility of the existing roller shutter doors, providing security when the building is not in use and the high-speed door for both ingress protection and restriction of who can use the door during norma

Model ARLH Dock house installation has been completed in Scotland 

Model ARLH Dock house installation has been completed in Scotland 

24th October, 2025

This standalone loading bay is connected to a newly installed fridge unit, and this design provides flexibility in a range of different scenarios.   The Armo Load House model ARLH is a fully constructed loading bay added on to the building façade, suitable for existing buildings or as new build and it doesn’t need to be installed square on; if your loading area is restricted the ARLH can be installed at an angle to give drivers maximum space. Typical Situations for requirem

Food industry installation underway in Hull

Food industry installation underway in Hull

10th October, 2025

6 loading bays in a temperature-sensitive food application, with this unusual design, the loading bay doors close down in front of the levellers and this design provides the flexibility to enable a docked refrigerated trailer to open the barn doors after the trailer has docked onto the bay, providing maximum food hygiene benefits  Armo have been manufacturing high quality loading bay and lifting table solutions since 1973 for further technical or pricing information, please contact

Modular dock and associated load-house project complete and handed over to our client!

Modular dock and associated load-house project complete and handed over to our client!

2nd October, 2025

Armo have been manufacturing high quality loading bay and lifting table solutions since 1973 for further technical or pricing information, please contact us.

A goods lift installation was recently completed in the London area

A goods lift installation was recently completed in the London area

12th September, 2025

Product on and off on the short side of the lift at the lower level, and product on and off on the long side of the lift at the upper level. Supplied with interlocked drop-down bolts and interlocked electro/mechanical locks so that both the upper and lower-level gate systems cannot be opened until the lift reaches the desired level. Armo have been manufacturing high quality loading bay and lifting table solutions since 1973 for further technical or pricing information, please contact us.

Modular dock and associated load-house nearing completion

Modular dock and associated load-house nearing completion

5th September, 2025

Armo have been manufacturing high quality loading bay and lifting table solutions since 1973 for further technical or pricing information, please contact us.

Modular Dock and Load House Installation in Oxfordshire

Modular Dock and Load House Installation in Oxfordshire

20th August, 2025

This scheme includes a 12 metre x 11 metre raised modular dock, incorporating 2 x loading bays, complete with a 21 metre long access ramp.  More photos of the installation to follow as works progress. Armo have been manufacturing high quality loading bay and lifting table solutions since 1973 for further technical or pricing information, please contact us.

New build construction project underway in Kirkham!

New build construction project underway in Kirkham!

25th July, 2025

6no. Model ARSL dock levellers installed into pre-cast concrete pits, ready for the final concrete floor pour. Armo have been manufacturing high quality loading bay and lifting table solutions since 1973 for further technical or pricing information, please contact us.

1
2
3
4
»

Accreditations & Partners

Kingspan
ISO 9001
CE Marking
Safe Contractor Approved
Castell
DHF